Gate Access Controls

Project Description | Schedule | Project Team | Back to Archive

Archived: July 2, 2007

Project Description

This project calls for the installation of electronic entrance gate access control systems at Portsmouth Marine Terminal (PMT) and Newport News Marine Terminal (NNMT). When complete, the project will allow Port Police to physically control entry/exit into the terminal, document personnel entering and exiting the facility, verify that personnel have a legitimate purpose to be on the marine terminal, record the entrance and exit times for all individuals on the terminal, and record vehicle license plates, container numbers and chassis numbers.

These systems may include traffic control arm/gate; driver communication pedestals with call button, intercom, speaker and microphone; proximity card reader; loop detectors and cameras to record the driver's face, container, overhead view, chassis, and license plate. Other components may include a Gate Control Console to be installed in existing buildings, a lane directional console, computers for interface with VPA and VIT databases and integration software.

Task Order A comprises all work to be performed at PMT. Task Order B comprises all work at NNMT.

This project is funded by a TSA Port Security Grant.

Current Estimated Construction Costs:
Portsmouth Marine Terminal (PMT): $628,000
Newport News Marine Terminal (NNMT): $270,000

Back to Top

Schedule

Phase
Target
Actual
Start Design June 2005 June 2005
Finish Design July 2005 July 2005
Advertise Sole Source Sole Source
Bids Due Sole Source Sole Source
Notice to Proceed N/A N/A
Substantial Completion N/A N/A
Final Completion September 1, 2005 June 12, 2007

Back to Top

Project Team

Project Manager Andy Hecker Tel: 757-628-8222
  Moffatt & Nichol Fax: 757-628-8244
     
Contractor L. A. King Co. Tel: 562-424-0979
  3306 Lime Avenue Fax: 562-424-7089
  Signal Hill, CA 90755  

Back to Tops

 

 


Click to Enlarge Image
PMT Project Locations

Click to Enlarge Image
PMT Truck Gate

Click to Enlarge Image
PMT POV Gate

Click to Enlarge Image
NNMT Project Location

Click to Enlarge Image
NNMT Gate

 