PMT New Crane Stowage & Wharf Modifications

Project Description | Schedule | Project Team | Back to Archive

Archived: October 20, 2004

Project Description

This project involves the work necessary to install eighteen (18) new crane tie-downs and twelve (12) new crane stowage sockets embedded in the concrete wharf at five (5) crane locations at PMT. This work shall include concrete demolition, cast in place concrete, reinforcing steel, structural steel, structural welding, grouting, asphalt patching, with some excavation and backfilling. These new locations will include a new storage location for the existing Kone crane and four locations for the arrival of three new ZPMC cranes.

Estimated Construction Cost: $325,000

Back to Top

Schedule

Phase
Target
Actual
Start Design December 2003 December 2003
Finish Design January 15, 2003 January 24, 2004
Advertise January 25, 2004 January 25, 2004
Bids Due February 12, 2004 February 12, 2004
Notice to Proceed March 4, 2004 March 4, 2004
Substantial Completion July 4, 2004 September 30, 2004
Final Completion July 4, 2004 September 30, 2004

Back to Top

Project Team

Project Manager Heath K Pope, P.E. Tel: 757-628-8222
  Moffatt & Nichol Fax: 757-628-8244
     
Contractor Earley Marine, Inc. Tel: (757) 430-0580
  2357 Esplanade Drive Fax: (757) 430-0583
  Virginia Beach, VA 23456  

Back to Top

 

 


Click to Enlarge Image
Work on Fourth Tie-Down Location 9/10/04

Click to Enlarge Image
Hardware in Place with Concrete

Click to Enlarge Image
Socket Excavation

 