Project Description
The project includes the construction of approximately 3,000 linear feet of heavy duty shuttle carrier pavement along Bulkhead Avenue from Third Street to Lagoon Avenue. Construction activities include erosion and sediment control, site demolition, earthwork, drainage, water distribution, asphalt pavement, concrete pavement, waterfront structural improvements, rail crossings, site lighting, electrical ductbank, utilities, traffic control, construction phasing, and tie-in with existing waterfront features, drainage lines and rail yard facilities. The work will include all other miscellaneous items specified with the Construction Plans and Specifications.
When complete, the new shuttle carrier road will allow for the efficient movement of containers between NIT North and NIT South via shuttle carrier vehicle.
Current Estimated Construction Cost: $8,210,500.00
Back to Top
Current Status
Demolition and utility work are ongoing and concrete pavement placement continues. Work is now bounded by Fifth Street and Third Street, and everything North of Fifth Street is complete. Asphalt pavement and concrete pavement will continue until the end of the project. Work on the second rail crossing at Pier One continues. Overall project is 80% complete.
Back to Top
Schedule
Phase |
Target |
Actual |
| Start Design |
October 15, 2006 |
October 15, 2006 |
| Finish Design |
June 1 , 2007 |
June 1, 2007 |
| Advertise |
June 3, 2007 |
June 3, 2007 |
| Bids Due |
July 19, 2007 |
July 19, 2007 |
| Notice to Proceed |
August 31, 2007 |
September 1, 2007 |
| Substantial Completion |
July 1, 2008 |
Estimated September 27, 2008 |
| Final Completion |
July 31, 2008 |
Estimated October 27, 2008 |
Back to Top
Related Documents
These documents will open in a new window. You may need Adobe® Reader to view some of these documents. Click here to download a free version.
| There are no related documents currently posted for this project. |
Back to Top
Photo Galleries
Back to Top
|
|

Project Area

Close-up of Route

Overview of Route

View from NIT North

Rail Crossing at Pier 2

Shuttle Carrier Vehicle
|
 |