![]() |
||||
Traffic Info Heartland Corridor Clearance Project Web Site
|
Traffic Info Construction of the rail line in the medians of I-664 and Route 64 will not impact traffic using those highways. During the construction of the new overpass bridge on Route 17, two lanes of traffic will be maintained at all times between College Drive and the I-664 Interchange via a temporary detour road immediately to the South. Route 17 Traffic Plan During Bridge Construction Those wishing to avoid the new bridge construction area on Route 17 can bypass the area entirely using the following alternate routes: Route 17 From High Street/Western Branch Boulevard (Northbound) Route 17 From Bridge Road (Southbound) The maps on this page are provided in PDF format and will open in a new window. These files are optimized for Adobe® Reader version 6.0 or above. Click here to download a free version of the latest Adobe® Reader software.
|
|||
|
|
![]() |
|||